PJ Club
2007 Gulfstream G150 - Photo 1
2007 Gulfstream G150 - Photo 2
2007 Gulfstream G150 - Photo 3
2007 Gulfstream G150 - Photo 4
2007 Gulfstream G150 - Photo 5
2007 Gulfstream G150 - Photo 6
1 / 6

2007 Gulfstream G150

Annapolis, Maryland

S/N 223 · N211TA

4,707 hrs

Total Time

7

Seats

2,714

Landings

Long Range

1.73

Flight Profile

  • Engines and APU Enrolled in MSP Gold
  • Paperless Cockpit with Dual IFIS, Datalink, Graphical Weather, and Electronic Checklists
  • Part 135 Current
  • RVSM, EGPWS, TCAS, ADS-B, WAAS/LPV
  • 2021 PAINT AND 2019 7 PASSENGER INTERIOR

No Programs

Enrolled in MSP Gold @ $521 / eng. hr.

Enrolled in MSP Gold @ $167 / hr.

Total Time

4,707 hrs

Total Landings

2,714

Maintenance tracking: MSP Gold

Times as of March 2026

Times as of March 2026

Left Engine

4,707

Hours Since New

4,707

Cycles

Honeywell

TFE 731-40AR-200G

Right Engine

2,714

Hours Since New

2,714

Cycles

Honeywell

TFE 731-40AR-200G

Enrolled in MSP Gold @ $521 / eng. hr.

Honeywell RE100 · 4,054 hrs

Enrolled in MSP Gold @ $167 / hr.

Collins Pro Line 21

  • Collins Pro Line 21 avionics suite
  • Rvsm
  • Egpws
  • Tcas
  • Ads-b
  • Waas/lpv
  • Dual Collins FMS-6100
  • Dual Collins FGC-3000 IFCS / AutoPilot
  • Dual Collins FSU-5010 IFIS
  • Collins VHF Datatlink
  • Triple Collins VHF-4000E Comms w/8.33 Spacing
  • Dual Collins NAV-4000 Navs w/FM Immunity
  • Dual Collins GPS -4000A
  • Dual Collins DME-4000
  • Dual Collins TDR-94D (Mode S) Transponders with flight ID
  • ICG ICS-2000 Iridum SATCOM with 3 handsets
  • Collins TWR-850 Color Radar w/ turbulence detection
  • Collins TTR-4000 TCAS II w/ Change 7.1
  • Honeywell Mark V EGPWS w/ windshear
  • Collins HF-9031A w/ SELCAL
  • Universal CVR-120 Cockpit Voice Recorder

Connectivity

WiFi: GoGo Biz AVANCE L3

SATCOM: ICG ICS-200 Iridium SATCOM

7-Passenger Interior

2021 Paint

Maintenance inspection status for this aircraft.

5A Inspection

Last Completed

2413 hours

Next Due

4913 hours

10A Inspection

Last Completed

2413 hours

Next Due

7413 hours

1C Inspection

Last Completed

May 2025

Next Due

Mar 2027

2C Inspection

Last Completed

May 2025

Next Due

Mar 2027

4C Inspection

Last Completed

Jun 2023

Next Due

Apr 2027

Inquire for Price