2009 Bombardier Challenger 300






2009 Bombardier Challenger 300
Burbank, CA
S/N 20251
VanAllen
6,149.4 hrs
Total Time
9
Seats
3,568 mi
Range
541 mph
Speed
4,335
Landings
1.42
Flight Profile
- Aircraft Repainted in 2025
- New Interior Soft Goods in 2026
- Starlink Wi-Fi Installation in 2026
- STARLINK WIFI INSTALLATION IN 2026
- CURRENTLY OPERATED PART 135 BY JET AVIATION
- HONEYWELL MSP GOLD ON ENGINES AND APU
Programs
Airframe
Total Time
6,149.4 hrs
Total Landings
4,335
Engines
Left Engine
6,149.4
Hours Since New
4,352
Cycles
Honeywell
AS907-1-1A
S/N P118641
Right Engine
6,149.4
Hours Since New
4,351
Cycles
Honeywell
AS907-1-1A
S/N P118640
APU
GTCP36-150(BD) · 7,459.1 hrs · S/N P-386
Avionics
Collins Pro Line 21 Advanced
- Collins TTR-4000 TCAS II w/Change 7.1
- Four Tube AFD 5220E EFIS/MFD, (8"x11" Displays)
- Dual HF-9000 w/SELCAL
- Dual Collins ADC-3000 Air Data Computers
- Collins ALT-4000 Radio Altimeter
- Dual Collins AHC- 3000 AHRS Computers
- Dual IFIS (2nd FSU)
- Dual Collins FGC- 3002 Flight Directors
- Activation of Enhanced Map Overlays
- RIU-4000 Radio Interface Unit
- RNP 1/2/4/5 and 10, PRNAV, MNPS and RVSM Capable
- Engine Instruments/Crew Alerting System (EICAS)
- Digital FA2100 Cockpit Voice Recorder
- Dual FMC-6200 Flight Management System w/ V Speeds
- Digital FA2100 Flight Data Recorder
- Collins NAV 4000 (VOR, ILS, MKR, ADF) Receiver
- Artex C406-N MHz ELT with Nav Interface
- Dual Collins DME 4000
- Dual VHF 4000 Comm Units w/ 8.33 MHz spacing 3rd VHF Com
- Datalink with SELCAL
- FANS 1/A+ over Iridium
- Dual Collins TDR-94D Transponders w/ Enhanced Surveillance w/ ADS-B out
Connectivity
WiFi: Starlink
SATCOM: ICS-220 Iridium Phone w/ Antennas
Interior
9 (+1) - PASSENGER LAYOUT FWD GALLEY FWD (4) PLACE CLUB AFT (3) PLACE LH D IVAN OPPOSITE (2) PLACE CLUB BELTED LAV
Exterior
LAST PAINTED JUNE 2025 AT 6,114.1 HRS BASE PAINT COLORS MATTERHORN WHITE GAMA GRAY GLOSS BLACK STRIPE COLORS AZTEC GOLD PEARL CHARCOAL GRAY
Inspections
Maintenance inspection status for this aircraft.
12 Month
Last Completed
June 12, 2025
Next Due
May 31, 2026
24 Month
Last Completed
June 12, 2025
Next Due
June 30, 2027
36 Month
Last Completed
June 12, 2025
Next Due
June 30, 2028
48 Month
Last Completed
June 12, 2025
Next Due
May 31, 2029
96 Month
Last Completed
June 12, 2025
Next Due
May 31, 2031
192 Month
Last Completed
June 12, 2025
Next Due
May 31, 2041
#1 Engine 800 Hr.
Last Completed
6,114.1
Next Due
6,914.1
#2 Engine 800 Hr.
Last Completed
6,114.1
Next Due
6,914.1
#1 Engine 4800 Hr.
Last Completed
4,163.4
Next Due
8,963.4
#2 Engine 4800 Hr.
Last Completed
4,163.4
Next Due
8,963.4
400 Hr.
Last Completed
5,972.6
Next Due
6,412.6
600 Hr.
Last Completed
6,114.1
Next Due
6,754.1
800 Hr.
Last Completed
5,797.3
Next Due
6,563.4
1200 Hr.
Last Completed
6,114.1
Next Due
7,354.1
1600 Hr.
Last Completed
5,354.9
Next Due
6,994.9
2400 Hr.
Last Completed
4,467.2
Next Due
6,907.2
3200 Hr.
Last Completed
6,114.1
Next Due
9,354.1
4200 Hr.
Last Completed
4,163.4
Next Due
8,363.4
9600 Hr.
Last Completed
N/A
Next Due
9,600.0
APU 800 Hr.
Last Completed
6,979
Next Due
7,731.8
APU 2400 Hr.
Last Completed
6,365
Next Due
8,774.0
| Inspection | Last Completed | Next Due |
|---|---|---|
| 12 Month | June 12, 2025 | May 31, 2026 |
| 24 Month | June 12, 2025 | June 30, 2027 |
| 36 Month | June 12, 2025 | June 30, 2028 |
| 48 Month | June 12, 2025 | May 31, 2029 |
| 96 Month | June 12, 2025 | May 31, 2031 |
| 192 Month | June 12, 2025 | May 31, 2041 |
| #1 Engine 800 Hr. | 6,114.1 | 6,914.1 |
| #2 Engine 800 Hr. | 6,114.1 | 6,914.1 |
| #1 Engine 4800 Hr. | 4,163.4 | 8,963.4 |
| #2 Engine 4800 Hr. | 4,163.4 | 8,963.4 |
| 400 Hr. | 5,972.6 | 6,412.6 |
| 600 Hr. | 6,114.1 | 6,754.1 |
| 800 Hr. | 5,797.3 | 6,563.4 |
| 1200 Hr. | 6,114.1 | 7,354.1 |
| 1600 Hr. | 5,354.9 | 6,994.9 |
| 2400 Hr. | 4,467.2 | 6,907.2 |
| 3200 Hr. | 6,114.1 | 9,354.1 |
| 4200 Hr. | 4,163.4 | 8,363.4 |
| 9600 Hr. | N/A | 9,600.0 |
| APU 800 Hr. | 6,979 | 7,731.8 |
| APU 2400 Hr. | 6,365 | 8,774.0 |
Equipment
- GALLEY APPLIANCES
- (2) Hot Liquid Containers, Nespresso Coffee Maker (Carry On), TIA Microwave
- Collins Airshow 4000
- 2nd LED Tail Nav Light and Wing Strobe Lights
- Pulsating Main LAnding Lights
Other Notes
- Currently Operated Part 135 By Jet Aviation
Total Time
6,149.4 hrs
Total Landings
4,335
Left Engine
6,149.4
Hours Since New
4,352
Cycles
Honeywell
AS907-1-1A
S/N P118641
Right Engine
6,149.4
Hours Since New
4,351
Cycles
Honeywell
AS907-1-1A
S/N P118640
GTCP36-150(BD) · 7,459.1 hrs · S/N P-386
Collins Pro Line 21 Advanced
- Collins TTR-4000 TCAS II w/Change 7.1
- Four Tube AFD 5220E EFIS/MFD, (8"x11" Displays)
- Dual HF-9000 w/SELCAL
- Dual Collins ADC-3000 Air Data Computers
- Collins ALT-4000 Radio Altimeter
- Dual Collins AHC- 3000 AHRS Computers
- Dual IFIS (2nd FSU)
- Dual Collins FGC- 3002 Flight Directors
- Activation of Enhanced Map Overlays
- RIU-4000 Radio Interface Unit
- RNP 1/2/4/5 and 10, PRNAV, MNPS and RVSM Capable
- Engine Instruments/Crew Alerting System (EICAS)
- Digital FA2100 Cockpit Voice Recorder
- Dual FMC-6200 Flight Management System w/ V Speeds
- Digital FA2100 Flight Data Recorder
- Collins NAV 4000 (VOR, ILS, MKR, ADF) Receiver
- Artex C406-N MHz ELT with Nav Interface
- Dual Collins DME 4000
- Dual VHF 4000 Comm Units w/ 8.33 MHz spacing 3rd VHF Com
- Datalink with SELCAL
- FANS 1/A+ over Iridium
- Dual Collins TDR-94D Transponders w/ Enhanced Surveillance w/ ADS-B out
Connectivity
WiFi: Starlink
SATCOM: ICS-220 Iridium Phone w/ Antennas
9 (+1) - PASSENGER LAYOUT FWD GALLEY FWD (4) PLACE CLUB AFT (3) PLACE LH D IVAN OPPOSITE (2) PLACE CLUB BELTED LAV
LAST PAINTED JUNE 2025 AT 6,114.1 HRS BASE PAINT COLORS MATTERHORN WHITE GAMA GRAY GLOSS BLACK STRIPE COLORS AZTEC GOLD PEARL CHARCOAL GRAY
Maintenance inspection status for this aircraft.
12 Month
Last Completed
June 12, 2025
Next Due
May 31, 2026
24 Month
Last Completed
June 12, 2025
Next Due
June 30, 2027
36 Month
Last Completed
June 12, 2025
Next Due
June 30, 2028
48 Month
Last Completed
June 12, 2025
Next Due
May 31, 2029
96 Month
Last Completed
June 12, 2025
Next Due
May 31, 2031
192 Month
Last Completed
June 12, 2025
Next Due
May 31, 2041
#1 Engine 800 Hr.
Last Completed
6,114.1
Next Due
6,914.1
#2 Engine 800 Hr.
Last Completed
6,114.1
Next Due
6,914.1
#1 Engine 4800 Hr.
Last Completed
4,163.4
Next Due
8,963.4
#2 Engine 4800 Hr.
Last Completed
4,163.4
Next Due
8,963.4
400 Hr.
Last Completed
5,972.6
Next Due
6,412.6
600 Hr.
Last Completed
6,114.1
Next Due
6,754.1
800 Hr.
Last Completed
5,797.3
Next Due
6,563.4
1200 Hr.
Last Completed
6,114.1
Next Due
7,354.1
1600 Hr.
Last Completed
5,354.9
Next Due
6,994.9
2400 Hr.
Last Completed
4,467.2
Next Due
6,907.2
3200 Hr.
Last Completed
6,114.1
Next Due
9,354.1
4200 Hr.
Last Completed
4,163.4
Next Due
8,363.4
9600 Hr.
Last Completed
N/A
Next Due
9,600.0
APU 800 Hr.
Last Completed
6,979
Next Due
7,731.8
APU 2400 Hr.
Last Completed
6,365
Next Due
8,774.0
| Inspection | Last Completed | Next Due |
|---|---|---|
| 12 Month | June 12, 2025 | May 31, 2026 |
| 24 Month | June 12, 2025 | June 30, 2027 |
| 36 Month | June 12, 2025 | June 30, 2028 |
| 48 Month | June 12, 2025 | May 31, 2029 |
| 96 Month | June 12, 2025 | May 31, 2031 |
| 192 Month | June 12, 2025 | May 31, 2041 |
| #1 Engine 800 Hr. | 6,114.1 | 6,914.1 |
| #2 Engine 800 Hr. | 6,114.1 | 6,914.1 |
| #1 Engine 4800 Hr. | 4,163.4 | 8,963.4 |
| #2 Engine 4800 Hr. | 4,163.4 | 8,963.4 |
| 400 Hr. | 5,972.6 | 6,412.6 |
| 600 Hr. | 6,114.1 | 6,754.1 |
| 800 Hr. | 5,797.3 | 6,563.4 |
| 1200 Hr. | 6,114.1 | 7,354.1 |
| 1600 Hr. | 5,354.9 | 6,994.9 |
| 2400 Hr. | 4,467.2 | 6,907.2 |
| 3200 Hr. | 6,114.1 | 9,354.1 |
| 4200 Hr. | 4,163.4 | 8,363.4 |
| 9600 Hr. | N/A | 9,600.0 |
| APU 800 Hr. | 6,979 | 7,731.8 |
| APU 2400 Hr. | 6,365 | 8,774.0 |
- GALLEY APPLIANCES
- (2) Hot Liquid Containers, Nespresso Coffee Maker (Carry On), TIA Microwave
- Collins Airshow 4000
- 2nd LED Tail Nav Light and Wing Strobe Lights
- Pulsating Main LAnding Lights
- Currently Operated Part 135 By Jet Aviation
Inquire for Price
Inquire for Price


