PJ Club
2008 Gulfstream G550 - Photo 1
2008 Gulfstream G550 - Photo 2
2008 Gulfstream G550 - Photo 3
2008 Gulfstream G550 - Photo 4
2008 Gulfstream G550 - Photo 5
2008 Gulfstream G550 - Photo 6
2008 Gulfstream G550 - Photo 7
2008 Gulfstream G550 - Photo 8
2008 Gulfstream G550 - Photo 9
2008 Gulfstream G550 - Photo 10
2008 Gulfstream G550 - Photo 11
2008 Gulfstream G550 - Photo 12
2008 Gulfstream G550 - Photo 13
2008 Gulfstream G550 - Photo 14
2008 Gulfstream G550 - Photo 15
2008 Gulfstream G550 - Photo 16
2008 Gulfstream G550 - Photo 17
2008 Gulfstream G550 - Photo 18
2008 Gulfstream G550 - Photo 19
2008 Gulfstream G550 - Photo 20
2008 Gulfstream G550 - Photo 21
2008 Gulfstream G550 - Photo 22
2008 Gulfstream G550 - Photo 23
2008 Gulfstream G550 - Photo 24
2008 Gulfstream G550 - Photo 25
2008 Gulfstream G550 - Photo 26
2008 Gulfstream G550 - Photo 27
2008 Gulfstream G550 - Photo 28
2008 Gulfstream G550 - Photo 29
2008 Gulfstream G550 - Photo 30
1 / 30

2008 Gulfstream G550

S/N 5204 · N510GT

Corporate Jet Aviation

7,252.8 hrs

总飞行时间

18

座位数

7,769 mi

航程

613 mph

速度

2,674

着陆次数

超远程

2.71

飞行概况

  • No damage history, complete logbooks, hangar stored, and maintained by Gulfstream and West Star Aviation since acquisition.
  • Gulfstream Savannah Level III++ completed at the current owner’s acquisition.
  • New leading edges installed by Gulfstream in 2018.
  • Major 2024 modernization and 2026 inspection work completed by West Star Aviation.
  • Rolls-Royce CorporateCare plus Honeywell MSP APU, Mechanical and Avionics Agreements.
  • 2023-24 integrated cabin + technology >$2.0M scope (CMS Evolve / Empire / Explore / Elevate, Starlink, galley/interior integration and closeout).
  • 2024 custom strip and repaint ($0.34M).
  • 2026 inspections + cabin flooring ($0.30M).
  • 4C / 48-month documented work 1/26/2026.
  • 6C / 72-month documented work 1/26/2026.
  • 8C / 96-month major inspection 3/1/2024.
  • 144-month documented work 1/26/2026.
  • 192-month / 16C completed in 2023-24 inspection package.
  • Midlife inspections were completed at 4,057 hours in April 2016.
Rolls-Royce CorporateCareHoneywell MSP APU AgreementHoneywell MSP Mechanical AgreementHoneywell MSP Avionics Agreement

Engine and APU positions reflect the supplied July 30, 2026 CMP status snapshot.

总飞行时间

7,252.8 hrs

总着陆次数

2,674

维护跟踪: Gulfstream MyCMP

Aircraft utilization as of July 30, 2026

Aircraft utilization as of July 30, 2026

Left 发动机

7,252.8

自新小时数

Rolls-Royce

BR710-C4-11

Right 发动机

7,252.8

自新小时数

Rolls-Royce

BR710-C4-11

Engine and APU positions reflect the supplied July 30, 2026 CMP status snapshot.

APU · 4,365 hrs

PlaneView

  • Enhanced Navigation
  • Waas/lpv
  • Fans 1/A
  • Cpdlc
  • Synthetic Vision

网络连接

WiFi: Starlink

A forward galley, main club cabin, conference/dining zone and private aft suite, supported by forward and aft lavatories. 1. ARRIVAL – Forward galley + forward lavatory 2. MAIN SALON – Club seating for work or conversation 3. CONFERENCE – Dining, meetings and generous storage 4. AFT SUITE – Lounge, sleep and private aft lavatory The spatial sequence is deliberate: service functions remain forward, collaborative work sits at the center, and the aft cabin becomes a quieter destination of its own.

该飞机的维护检查状态。

4C / 48-month

Documented work

上次完成

1/26/2026

下次到期

Principal phase through 2030. Earlier phased items shown at 30 Jun 2026

6C / 72-month

Documented work

上次完成

1/26/2026

下次到期

Principal phase through 2031. Earlier phased items shown at 30 Jun 2026

8C / 96-month

Major inspection

上次完成

3/1/2024

下次到期

Principal phases 2028-2032. One phased item shown at 31 Jul 2026

144-month

Documented work

上次完成

1/26/2026

下次到期

Principal phases 2032-2038. Two phased items shown at 31 Jul 2026

192-month / 16C

2023-24 inspection package

上次完成

2023-24 inspection package

下次到期

Separate phase 31 Dec 2031. Principal phase 31 Mar 2040

  • 18 PAX – PLUS COCKPIT JUMPSEAT
  • Program diligence note: Current coverage, paid status and assignability will be confirmed through program statements during transaction diligence.
  • Source: Gulfstream MyCMP status report created 5 August 2026; utilization through 30 July 2026.

Inquire for Price