2008 Gulfstream G550






2008 Gulfstream G550
S/N 5204 · N510GT
Corporate Jet Aviation
7,252.8 hrs
总飞行时间
18
座位数
7,769 mi
航程
613 mph
速度
2,674
着陆次数
2.71
飞行概况
- No damage history, complete logbooks, hangar stored, and maintained by Gulfstream and West Star Aviation since acquisition.
- Gulfstream Savannah Level III++ completed at the current owner’s acquisition.
- New leading edges installed by Gulfstream in 2018.
- Major 2024 modernization and 2026 inspection work completed by West Star Aviation.
- Rolls-Royce CorporateCare plus Honeywell MSP APU, Mechanical and Avionics Agreements.
- 2023-24 integrated cabin + technology >$2.0M scope (CMS Evolve / Empire / Explore / Elevate, Starlink, galley/interior integration and closeout).
- 2024 custom strip and repaint ($0.34M).
- 2026 inspections + cabin flooring ($0.30M).
- 4C / 48-month documented work 1/26/2026.
- 6C / 72-month documented work 1/26/2026.
- 8C / 96-month major inspection 3/1/2024.
- 144-month documented work 1/26/2026.
- 192-month / 16C completed in 2023-24 inspection package.
- Midlife inspections were completed at 4,057 hours in April 2016.
维护计划
Engine and APU positions reflect the supplied July 30, 2026 CMP status snapshot.
Airframe
总飞行时间
7,252.8 hrs
总着陆次数
2,674
维护跟踪: Gulfstream MyCMP
Aircraft utilization as of July 30, 2026
Engines
Aircraft utilization as of July 30, 2026
Left 发动机
7,252.8
自新小时数
Rolls-Royce
BR710-C4-11
Right 发动机
7,252.8
自新小时数
Rolls-Royce
BR710-C4-11
Engine and APU positions reflect the supplied July 30, 2026 CMP status snapshot.
APU
APU · 4,365 hrs
Avionics
PlaneView
- Enhanced Navigation
- Waas/lpv
- Fans 1/A
- Cpdlc
- Synthetic Vision
网络连接
WiFi: Starlink
内饰
A forward galley, main club cabin, conference/dining zone and private aft suite, supported by forward and aft lavatories. 1. ARRIVAL – Forward galley + forward lavatory 2. MAIN SALON – Club seating for work or conversation 3. CONFERENCE – Dining, meetings and generous storage 4. AFT SUITE – Lounge, sleep and private aft lavatory The spatial sequence is deliberate: service functions remain forward, collaborative work sits at the center, and the aft cabin becomes a quieter destination of its own.
检查
该飞机的维护检查状态。
4C / 48-month
Documented work
上次完成
1/26/2026
下次到期
Principal phase through 2030. Earlier phased items shown at 30 Jun 2026
6C / 72-month
Documented work
上次完成
1/26/2026
下次到期
Principal phase through 2031. Earlier phased items shown at 30 Jun 2026
8C / 96-month
Major inspection
上次完成
3/1/2024
下次到期
Principal phases 2028-2032. One phased item shown at 31 Jul 2026
144-month
Documented work
上次完成
1/26/2026
下次到期
Principal phases 2032-2038. Two phased items shown at 31 Jul 2026
192-month / 16C
2023-24 inspection package
上次完成
2023-24 inspection package
下次到期
Separate phase 31 Dec 2031. Principal phase 31 Mar 2040
| 检查 | 描述 | 上次完成 | 下次到期 |
|---|---|---|---|
| 4C / 48-month | Documented work | 1/26/2026 | Principal phase through 2030. Earlier phased items shown at 30 Jun 2026 |
| 6C / 72-month | Documented work | 1/26/2026 | Principal phase through 2031. Earlier phased items shown at 30 Jun 2026 |
| 8C / 96-month | Major inspection | 3/1/2024 | Principal phases 2028-2032. One phased item shown at 31 Jul 2026 |
| 144-month | Documented work | 1/26/2026 | Principal phases 2032-2038. Two phased items shown at 31 Jul 2026 |
| 192-month / 16C | 2023-24 inspection package | 2023-24 inspection package | Separate phase 31 Dec 2031. Principal phase 31 Mar 2040 |
其他备注
- 18 PAX – PLUS COCKPIT JUMPSEAT
- Program diligence note: Current coverage, paid status and assignability will be confirmed through program statements during transaction diligence.
- Source: Gulfstream MyCMP status report created 5 August 2026; utilization through 30 July 2026.
Engine and APU positions reflect the supplied July 30, 2026 CMP status snapshot.
总飞行时间
7,252.8 hrs
总着陆次数
2,674
维护跟踪: Gulfstream MyCMP
Aircraft utilization as of July 30, 2026
Aircraft utilization as of July 30, 2026
Left 发动机
7,252.8
自新小时数
Rolls-Royce
BR710-C4-11
Right 发动机
7,252.8
自新小时数
Rolls-Royce
BR710-C4-11
Engine and APU positions reflect the supplied July 30, 2026 CMP status snapshot.
APU · 4,365 hrs
PlaneView
- Enhanced Navigation
- Waas/lpv
- Fans 1/A
- Cpdlc
- Synthetic Vision
网络连接
WiFi: Starlink
A forward galley, main club cabin, conference/dining zone and private aft suite, supported by forward and aft lavatories. 1. ARRIVAL – Forward galley + forward lavatory 2. MAIN SALON – Club seating for work or conversation 3. CONFERENCE – Dining, meetings and generous storage 4. AFT SUITE – Lounge, sleep and private aft lavatory The spatial sequence is deliberate: service functions remain forward, collaborative work sits at the center, and the aft cabin becomes a quieter destination of its own.
该飞机的维护检查状态。
4C / 48-month
Documented work
上次完成
1/26/2026
下次到期
Principal phase through 2030. Earlier phased items shown at 30 Jun 2026
6C / 72-month
Documented work
上次完成
1/26/2026
下次到期
Principal phase through 2031. Earlier phased items shown at 30 Jun 2026
8C / 96-month
Major inspection
上次完成
3/1/2024
下次到期
Principal phases 2028-2032. One phased item shown at 31 Jul 2026
144-month
Documented work
上次完成
1/26/2026
下次到期
Principal phases 2032-2038. Two phased items shown at 31 Jul 2026
192-month / 16C
2023-24 inspection package
上次完成
2023-24 inspection package
下次到期
Separate phase 31 Dec 2031. Principal phase 31 Mar 2040
| 检查 | 描述 | 上次完成 | 下次到期 |
|---|---|---|---|
| 4C / 48-month | Documented work | 1/26/2026 | Principal phase through 2030. Earlier phased items shown at 30 Jun 2026 |
| 6C / 72-month | Documented work | 1/26/2026 | Principal phase through 2031. Earlier phased items shown at 30 Jun 2026 |
| 8C / 96-month | Major inspection | 3/1/2024 | Principal phases 2028-2032. One phased item shown at 31 Jul 2026 |
| 144-month | Documented work | 1/26/2026 | Principal phases 2032-2038. Two phased items shown at 31 Jul 2026 |
| 192-month / 16C | 2023-24 inspection package | 2023-24 inspection package | Separate phase 31 Dec 2031. Principal phase 31 Mar 2040 |
- 18 PAX – PLUS COCKPIT JUMPSEAT
- Program diligence note: Current coverage, paid status and assignability will be confirmed through program statements during transaction diligence.
- Source: Gulfstream MyCMP status report created 5 August 2026; utilization through 30 July 2026.
Inquire for Price
Inquire for Price


























