





Aurora, Oregon
S/N 209 · N774GH
5,277 hrs
Total Time
10
Seats
3,438
Landings
1.53
Flight Profile
No Programs
Loaner currently installed-waiting on CZI completion expected this March/April. Current loaner engine covered along with R/R once engine is returned.
Total Time
5,277 hrs
Total Landings
3,438
Maintenance tracking: CSP Gold (Engines), M.S.P. Gold (APU)
Left Engine
4,548
Hours Since New
3,000
Cycles
Honeywell
CFE738-1-1B
Right Engine
5,053
Hours Since New
Honeywell
CFE738-1-1B
Loaner currently installed-waiting on CZI completion expected this March/April. Current loaner engine covered along with R/R once engine is returned.
Honeywell GTCP36-150[F2M] · 3,255 hrs
Connectivity
WiFi: GoGo AVANCE L5
New $1M 10 place Interior by Duncan 500 hours ago. Ten passenger configuration with four forward club chairs, aft four seat conference/dining, and two single chairs.Forward galley with hot/cold sink, glass rack, oven, coffeemaker and ice storage and jump seat. L-5 AVANCE WiFi system, 10 (dual style) USB Outlets-2 crew and 8 cabin, New LED lighting throughout. New metal plating, New Wood and Veneers throughout, new style PSU’s, New interior panels, Custom drawer inserts, Audio and Video distribution, Lighting controls, Cabin temperature, Streaming Moving Map, iPad/iPhone interface (JetMap), Touchscreen Control master unit, Blu-Ray DVD, HDMI ports, 4 HD A udio Inputs, GoGo Vision Input interface and two HD 24” Widescreen Monitors. All passenger carry on devices can be charged while in use. New Solid Counter Surfaces throughout, full lav refinish, new sinks, fixtures, lighting, surfaces, etc., paddle style door latches, and so much more.
New by Duncan 500 hours ago in White with Deep Green lower, with Gold and Red trim stripes
Maintenance inspection status for this aircraft.
12/24 month
Last Completed
N/A
Next Due
March 2026
36 month
Last Completed
N/A
Next Due
March 2028
Landing gear O/H
Last Completed
N/A
Next Due
April 2028
1C Inspection
Last Completed
N/A
Next Due
April 2028
| Inspection | Last Completed | Next Due |
|---|---|---|
| 12/24 month | N/A | March 2026 |
| 36 month | N/A | March 2028 |
| Landing gear O/H | N/A | April 2028 |
| 1C Inspection | N/A | April 2028 |
No Programs
Loaner currently installed-waiting on CZI completion expected this March/April. Current loaner engine covered along with R/R once engine is returned.
Total Time
5,277 hrs
Total Landings
3,438
Maintenance tracking: CSP Gold (Engines), M.S.P. Gold (APU)
Left Engine
4,548
Hours Since New
3,000
Cycles
Honeywell
CFE738-1-1B
Right Engine
5,053
Hours Since New
Honeywell
CFE738-1-1B
Loaner currently installed-waiting on CZI completion expected this March/April. Current loaner engine covered along with R/R once engine is returned.
Honeywell GTCP36-150[F2M] · 3,255 hrs
Connectivity
WiFi: GoGo AVANCE L5
New $1M 10 place Interior by Duncan 500 hours ago. Ten passenger configuration with four forward club chairs, aft four seat conference/dining, and two single chairs.Forward galley with hot/cold sink, glass rack, oven, coffeemaker and ice storage and jump seat. L-5 AVANCE WiFi system, 10 (dual style) USB Outlets-2 crew and 8 cabin, New LED lighting throughout. New metal plating, New Wood and Veneers throughout, new style PSU’s, New interior panels, Custom drawer inserts, Audio and Video distribution, Lighting controls, Cabin temperature, Streaming Moving Map, iPad/iPhone interface (JetMap), Touchscreen Control master unit, Blu-Ray DVD, HDMI ports, 4 HD A udio Inputs, GoGo Vision Input interface and two HD 24” Widescreen Monitors. All passenger carry on devices can be charged while in use. New Solid Counter Surfaces throughout, full lav refinish, new sinks, fixtures, lighting, surfaces, etc., paddle style door latches, and so much more.
New by Duncan 500 hours ago in White with Deep Green lower, with Gold and Red trim stripes
Maintenance inspection status for this aircraft.
12/24 month
Last Completed
N/A
Next Due
March 2026
36 month
Last Completed
N/A
Next Due
March 2028
Landing gear O/H
Last Completed
N/A
Next Due
April 2028
1C Inspection
Last Completed
N/A
Next Due
April 2028
| Inspection | Last Completed | Next Due |
|---|---|---|
| 12/24 month | N/A | March 2026 |
| 36 month | N/A | March 2028 |
| Landing gear O/H | N/A | April 2028 |
| 1C Inspection | N/A | April 2028 |
Inquire for Price
Inquire for Price